Obsolete refrigerant fleet
Your R22, R404A, R134a are on borrowed time. Anticipate the F-Gas phase-out.
Rather than scrapping a still-working machine, we reconfigure the refrigeration cycle, swap high-GWP refrigerants for low-carbon alternatives, and bring controls back to state of the art. Economical, ecological, quick to implement.
−60% GWP
typical reduction in global-warming potential after refrigerant swap
6-18 mo
average payback time for a full refurbishment
F-Gas
compliance with EU refrigerant regulation 2024-2030
From a simple refrigerant swap to a full refurbishment of a production plant, each mission is scoped against your operational constraints and budget.
01
Detailed machine inspection, history review, precise identification of pain points.
02
Refrigerant choice, sizing, updated refrigeration scheme, thermodynamic validation.
03
Works management: regulated recovery of old refrigerants, conversion, mechanical adjustments.
04
Performance tests, control calibration, follow-up period with validation measurements.
Technical documents, measurable data, an immediately usable action plan.
Cooling regime optimisation
Floating condensation and evaporation setpoints, load-adaptive control, sub-cooling and heat recovery to maximise the COP.
AI-enhanced standardised controls
Controller upgrade with adaptive algorithms trained on the plant's operating patterns; seamless integration with the existing BMS.
Performance monitoring
Post-commissioning dashboard with automatic energy KPI logging and verification of actual savings over 6 to 12 months.
Regulatory dossier
Full DOE (as-built dossier), updated installation plan and operating procedures.
Your R22, R404A, R134a are on borrowed time. Anticipate the F-Gas phase-out.
Degraded performance but sound frame: refurbishment is more cost-effective.
Fast savings on consumption without touching the mechanics.
Conversion to NH₃ or transcritical CO₂ for massive decarbonisation.
Cycle optimisation on chilled-water plants.
Move to free-cooling, waste-heat valorisation.
Send us a datasheet or schematic: we assess the refurbishment potential within 5 days.